This list contains only the countries for which job offers have been published in the selected language (e.g., in the French version, only job offers written in French are displayed, and in the English version, only those in English).
Our people are ambitious and humble, believing in what they do and convinced that our purpose is shaping a world of trust. With responsibility and openness, they daily serve our 400.000 clients in 140 countries, to bettering society. Across all our businesses and countries, each one of our people leaves their mark in shaping society. > We believe that leaving a mark is a true challenge and opportunity for every one of us. > We believe that leaving a mark is a sign of trust and impact. > We believe that leaving a mark is a bond with the future. > We believe that leaving a mark is proof of growth and development. Being part of the BV family, is more than just working, it’s being convinced that you will leave your mark... in shaping a world of Trust.
Job Responsibility:
observe and verify equipment assembly / make-up, inspection, pressure testing, function testing, dimension checking at other contractor supply base, the review and verification of all related pressure test and torque charts as well as instrumentation testing and calibration documentation
review other contractor’s lifting management systems and procedures and verify that they comply with Company’s latest Lifting Management System (LMS) requirement and examine and verify that all transportation, lifting and handling equipment, including transport baskets are properly certified and inspected including lifting capacity certification and corresponding load capacity markings
examine and confirm that other contractors’ inspection, lifting, handling, preservation and storage procedures for carbon steel and High Chrome/Corrosion-Resistant Alloy (CRA) tubulars/equipment in accordance with conform to the API requirements (API 5CT, API 5CRA, API RP 5C1, API 5A5, API 5A3, etc)
verify that drilling tubulars have been inspected in conformance with the requirements of either DS-1 or NS-2 including the review of inspection documentation for each item
review and validate data packages provided by other contractors on delivery of materials including certificates of origin, material certification, inspection and testing reports and charts
examine all relevant items of surface equipment that will be operated in Zone 1 or 2 and confirm that they have been designed, manufactured, equipped and rated to operate in Zone 1 or 2 in accordance with the requirements of ATEX - European Union Directive 94/9/EC (or equivalent) and certified as such by an officially appointed ATEX Notified Body
review and approve welding and heat treatment procedures and welder qualification test certificates and observe that critical welds and heat treatment are performed in accordance with the approved procedures
observe casing and tubing inspections and/or review the documentation to verify that the inspections including visual and dimensional inspection, hardness testing, magnetic particle inspection, electromagnetic inspection, residual magnetism measurement and demagnetisation, ultrasonic inspection and evaluation of imperfections and deviations have been performed in accordance with API RP 5A5, and verify that the tubulars have been properly cleaned and tubular coating and thread compound has been properly applied
perform equipment failure and damage investigations including witnessing the tear down of failed and/or damaged equipment. This also includes the review and evaluation of other contractors' damage/failure reports and a complete review of the subject equipment’s maintenance, inspection, repair and failure history
maintain a non-conformance log with a description of all significant quality assurance and control non-conformities, with the identity of offending party and corrective action taken as well as provide trend analysis and regular reporting
and review other contractors quality management systems and plans, records and certification status and report all significant non-conformities
Requirements:
Personnel shall have minimum Diploma in Engineering and shall have training in: ISO 9001, ISO TS 29001 and API Specification Q1/Q2
Personnel shall possess high proficiency/competency/skill, including but not limited to: API Spec 5CT and 5CRA, API RP 7G, API RP 7G-2, API RP 5A5, NS-2™, and DS-1™ for OCTG and Drilling String/Downhole Tool inspection/evaluation
Non-Destructive Examination (NDT) process and result evaluation
Welding procedure specification and result evaluation
Pressure and stack-up testing protocols including SIT and FAT/SAT
Machine shop repair, re-manufacture, and gauging & threading process, evaluation and final acceptance inspection
DNV/BS EN specifications compliance for safe lifting procedures
Personnel shall have minimum of 10 years of documented QA/QC experience specifically in Drilling and Well Services Equipment combined with relevant engineering and/or inspection background and with sufficient knowledge to verify individual items as fit for purpose at time of load out
Personnel shall demonstrate experience in HPHT drilling and completion equipment QAQC inspection and surveillance