This list contains only the countries for which job offers have been published in the selected language (e.g., in the French version, only job offers written in French are displayed, and in the English version, only those in English).
Creating an integrated project plan and maintaining key milestones
Incorporating logistics requirements into designs
Ordering materials in order to ensure availability
Conducting logistics risk analyses
Securing and allocating financial resources for packaging and customer tooling
Proactively managing materials availability by making sure the bill of material (raw materials list) and technical product drawings required for a particular part are available on schedule
Creating transparent parts supply and demand schedules
Evaluating the consequences that proposed plan changes have on the supply chain
Creating, aligning, and monitoring implementation plans for engineering changes, while safeguarding the impact on material timing, cost and quality
Contributing to the further development of the product life cycle management department
Support Transfer Projects following the agreed roles and responsibilities for specific transfer types – drive supplier readiness and timeline adherence through transfer team (SQE and LSM)
Own continuity of supply during reallocation — n-tier capacity checks, buffer and last-time buy strategies, and risk identification with mitigations
Support and execute technical release procedures to ensure quality and prevent (hard)downs in the factory — first build/qualification milestones, Factory Integration Testing and release criteria following Transfer Methodology
Manage escalations across suppliers/factories/engineering — resolve bottlenecks and prevent recurrence through collaboration with the SAT and Transfer Team to find root-causes of issues and solutions, sharing lessons learned
Provide structured input for Transfer Team owned Cross-overplanning — tooling ownership, NRE, packaging/customer tooling budgets and D&S/buffer planning
Requirements:
MSc in Industrial Engineering or Supply Chain / Logistics
Up to 7 years of experience in planning, logistics processes and quality in preferably high-tech, low-volume environment, and in ramping up new products
Project management related experience preferably in a high-tech, low volume environment (e.g. supply chain engineering
new product logistics)
Experience in driving process development and process improvements
Root cause analysis and proactively drive improvements for process / system
Ensuring accountability of deliverables of cross-sector stakeholders
Proficient planning and alignment skills
Stakeholder management - influence without authority