This list contains only the countries for which job offers have been published in the selected language (e.g., in the French version, only job offers written in French are displayed, and in the English version, only those in English).
We are looking for an ICSS Engineer. The SERVICE holder’s overall responsibility is made of several key activities: Handover with engineering team and Participate to ICSS activities, in particular the ICSS software FAT (Factory acceptance tests).
Job Responsibility:
Handover with engineering team
Participate to ICSS activities, in particular the ICSS software FAT (Factory acceptance tests)
Handover with engineering team
Job holder shall be integrated in engineering team to ensure proper handover with current ICSS team. This shall happen in Contractor’s premises in Nanterre before ICSS SW FAT start (ideally 1 month before)
Participation to ICSS activities
Job holder shall participate to ICSS Software FAT
Job holder shall be located at ICSS supplier premises where ICSS SW FAT stagging area is located
Full time presence is required during the first part of the FAT (till delivery of the application related to ITR2, 6 months estimated duration). Part time presence shall be considered after that till end of FAT activities on the stagging area, activities being then split between FAT stagging area and site activities
ICSS software FAT shall be executed as per GS EP INS 134 and encompasses PCS, PSS, ESD, FGS tests (full functional tests), tests of packaged units integrated or interfaced with ICSS, cybersecurity testing and integrated FAT
During SW FAT, job holder shall actively participate to testing activities, sharing his/her time between testing teams
Job holder shall coordinate on at least a daily basis with CPY ICSS lead, review with him/her subjects identified during FAT
Job holder shall ensure testing is performed as per procedure in place and following GS EP INS 134
Job holder shall monitor and follow-up testing related to package part, either directly integrated in ICSS (P1/P2) or interfaced (P3)
Job holder shall identify any points requiring arbitration from ICSS lead
Job holder shall actively interface with ICSS supplier team, CONTRACTOR team, PROJECT team involved in testing activities
Job holder shall identify any comments to be done on engineering documents used for FAT and be responsible for maintain the appropriate level of information
Job holder shall be responsible to monitor testing and closure of punches identified during FAT either in ICSS stagging area or on site, and reports to ICSS lead
During FAT part time involvement, job holder is expected to support site team for activities related to ICSS and to participate to smooth hand-over with commissioning and operation teams
Requirements:
Diploma: Instrumentation or Control Engineer with proven experience (> 10 years) with large onshore plants and LNG plants detailed design
Professional experience: several years of proven experience in EPSCC and operation stages of LNG projects
Good teamwork, strong minded, previous team Management desirable
Experience in participating to ICSS FAT on large projects