This list contains only the countries for which job offers have been published in the selected language (e.g., in the French version, only job offers written in French are displayed, and in the English version, only those in English).
Crusoe is rapidly expanding hyper-scale AI data center infrastructure in Abilene, Texas and across multiple U.S. campuses. We are seeking an experienced Data Center Construction Safety Manager to lead health, safety, and environmental programs during the most critical and high-risk phases of construction. This role sits directly at the intersection of heavy industrial construction and mission-critical infrastructure. You will own safety performance during large-scale workforce ramp-ups, heavy equipment operations, and the transition from construction site to live, energized environments. This is a highly visible role partnering closely with construction leadership, general contractors, commissioning teams, and site operations to ensure infrastructure is delivered safely and at a global scale.
Job Responsibility
Own site-wide health, safety, and environmental (HSE) programs for hyperscale data center construction projects
Perform daily walkthroughs focused on high-risk activities including trenching, crane operations, scaffolding, and heavy equipment
Lead safety oversight during the transition to live power environments, including UPS, switchgear, and generators
Enforce strict compliance with OSHA 1926 construction standards and NFPA 70E electrical safety requirements
Review, approve, and manage high-risk permits for Hot Work, Confined Space Entry, and Critical Lifts
Audit general contractor safety programs and lead weekly safety leadership meetings
Track and report incident rates, near misses, and leading safety indicators to drive continuous improvement
Establish and maintain emergency response plans, evacuation routes, and medical response procedures.
Requirements
Bachelor’s degree in Occupational Health & Safety, Environmental Science, Construction Management, or a related field
5+ years in heavy industrial construction safety (e.g., oil and gas, power generation, or large-scale manufacturing)
Current OSHA 30-Hour Construction certification
First Aid, CPR, and AED certification
Deep working knowledge of OSHA construction regulations and NFPA 70E, including arc flash boundaries and PPE selection
Proven ability to influence site leadership and manage safety performance under aggressive project timelines
Ability to work full-time on active construction sites, including walking long distances, climbing ladders, and working outdoors in varying conditions
This position is designated a safety-sensitive position and/or is located in a safety-sensitive facility. Drug and alcohol program participation is required.
Nice to have
Professional certifications such as CSP, ASP, GSP, or CHST
Prior experience specifically supporting data center construction or commissioning
Experience managing complex Lockout/Tagout (LOTO) procedures for redundant power systems
Proficiency with construction management platforms such as Procore or SafetyCulture/iAuditor.
What we offer
Restricted Stock Units in a fast growing, well-funded technology company
Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents
Employer contributions to HSA accounts
Paid Parental Leave
Paid life insurance, short-term and long-term disability