CrawlJobs Logo

Associate Estimator - Change Order

Costa Rica, Heredia Metro Area · Job Posted April 11, 2026
Apply Position
Job Link Share

Job Description

Are you looking for a new opportunity to continue building your career in the construction industry? We’re searching for an ambitious individual with a talent for organization and process management to join our team as an Associate Estimator. In this role, you’ll play a key part in Power Design’s growth by supporting timely, accurate and comprehensive electrical, mechanical and/or plumbing estimates for multifamily and commercial projects within our Change Order department.

Job Responsibility

  • Work with a regionally-aligned estimating team, providing leadership, direction and training
  • Perform necessary research to produce accurate, complete and competitive pricing
  • Conduct lighting fixture counts by reviewing construction plans and blueprints
  • Conduct mechanical equipment and terminal device counts by reviewing construction plans and blueprints
  • Conduct plumbing fixture counts by reviewing construction plans and blueprints
  • Communicate with customers to properly define the project scope, address deficiencies and negotiate pricing
  • Partner with our construction teams to properly transfer awarded projects

Requirements

  • Bachelor’s degree in construction management, engineering or related degree is preferred or 3-4 years of electrical, mechanical, and/or plumbing field experience
  • 1+ years of relevant electrical, mechanical and/or plumbing estimating experience
  • A motivated problem solver with a focus on customer service
  • Someone who thrives in a fast-paced, constantly changing environment with very strict deadlines
  • Excellent communicator who is organized, detail-oriented and efficient
  • Proficiency in Microsoft Office and estimating software (Accubid preferred)
  • Candidates must be fluent in written and spoken English, as this role requires communication with English-speaking clients and colleagues
  • Demonstrate and uphold all of Power Design’s core values, which include integrity, accountability, teamwork, innovation and growth

Looking for more opportunities?

Search for other job offers that match your skills and interests.

Similar Jobs for

Associate Estimator - Change Order

8 matching positions

Program Manager (Healthcare)

The Program Manager (Healthcare Facilities) will provide leadership, oversight, ...
Location
Location
United States
Salary
Salary:
Not provided
bodwegroup.com Logo
Bodwé Professional Services
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Bachelor's degree in Business Administration, Healthcare Administration, Facilities Management, Information Systems, Engineering, or a related discipline from an accredited institution
  • Minimum of five (5) years of Department of Defense (DoD) experience
  • At least one (1) year of experience directly supporting the duties and responsibilities outlined in this position
  • Minimum of three (3) years of experience in medical facility management, facilities operations, healthcare facilities, or a closely related field
  • Experience managing programs, projects, or contracts within a federal or military environment
  • Strong written and verbal communication skills
  • Experience coordinating cross-functional teams and stakeholders
  • Ability to analyze data, prepare reports, and support executive-level decision-making
  • Must have or be able to obtain and maintain a Real ID or Passport in order to undergo commercial airfare travel
  • Must have or be able to obtain and maintain a valid driver's license
Job Responsibility
Job Responsibility
  • Serve as the primary point of contact for BUMED and the Contracting Officer's Representative (COR) regarding contract performance and program execution
  • Provide overall program management support for a comprehensive DMLSS-FM database sustainment program
  • Monitor contract performance, key milestones, deliverables, and operational issues, ensuring stakeholders are informed through written and verbal communications
  • Coordinate daily operational activities related to contract execution and program objectives
  • Support DMLSS-FM development initiatives proposed by JMLFDC representatives and end users
  • Represent BUMED as a designated member of the DMLSS Facilities Management Team
  • Participate in weekly JMLFDC teleconferences, Facilities Management Team meetings, and other required Medical Service meetings
  • Serve as the primary point of contact for BUMED-specific system change requests
  • Assist in developing, testing, validating, and implementing functional requirements for future DMLSS maintenance releases
  • Support interoperability efforts between DMLSS and other Computerized Maintenance Management Systems (CMMS)
  • Fulltime
Read More
Arrow Right
New

Senior Software Engineer

Every day, Global Payments makes it possible for millions of people to move mone...
Location
Location
India , Pune
Salary
Salary:
Not provided
vuejs.org Logo
Vue
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • BS in Computer Science, Information Technology, Business / Management Information Systems or related field
  • Typically minimum of 4 years - Professional Experience In Coding, Designing, Developing And Analyzing Data
  • Advanced knowledge and use of one or more front / back end languages / technologies
  • Moderate understanding of the other corresponding end language / technology from the following but not limited to: two or more modern programming languages used in the enterprise, experience working with various APIs, external Services, experience with both relational and NoSQL Databases
Job Responsibility
Job Responsibility
  • Develops basic to moderately complex code using front and / or back end programming languages within multiple platforms as needed in collaboration with business and technology teams for internal and external client software solutions
  • Designs, creates, and delivers routine to moderately complex program specifications for code development and support on multiple projects/issues with a wide understanding of the application / database to better align interactions and technologies
  • Analyzes, modifies, and develops moderately complex code/unit testing in order to develop concise application documentation
  • Performs testing and validation requirements for moderately complex code changes
  • Performs corrective measures for moderately complex code deficiencies and escalates alternative proposals
  • Participates in client facing meetings, joint venture discussions, vendor partnership teams to determine solution approaches
  • Provides support to leadership for the design, development and enforcement of business / infrastructure application standards to include associated controls, procedures and monitoring to ensure compliance and accuracy of data
  • Applies a full understanding of procedures, methodology and application standards to include Payment Card Industry (PCI) security compliance
  • Conducts and provides basic billable hours and resource estimates on initiatives, projects and issues
  • Assists with on-the-job training and provides guidance to other software engineers
  • Fulltime
Read More
Arrow Right

Project Engineer III

Project Engineer III is an opportunity to support instrumentation and controls w...
Location
Location
United States , Sabine Pass
Salary
Salary:
Not provided
airswift.com Logo
Airswift Sweden
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Degree in engineering / technology and 12+ years of industry experience
  • Project engineering experience at operating facility on small capital and expense projects with demonstrated ability to handle multiple projects simultaneously
  • Experience managing project budgets and schedules within acceptable tolerances
  • Knowledge of equipment specification and procurement processes
  • General knowledge of multiple areas below with expertise in at least one: Field Instrumentation and Controls
  • Actuated Valve Design and Operations
  • Distributed Control Systems, Safety Systems, and PLCs for packaged equipment
  • Smart Plant Instrumentation Tool
  • Wireless Technology and Devices
  • HMI Graphics Development and Deployment
Job Responsibility
Job Responsibility
  • Support project management activities including routine project updating and forecasting, cost controlling, schedule adherence, change management, documentation, and closeout
  • Work with project or opportunity owners to define and develop project scope, goals, and deliverables through the staged gate project management system
  • Develop project cost and schedule estimates based on vendor information and market conditions, and prepare funding requests
  • Assemble specifications, procedures, scope of work, and other required documentation into bid packages
  • Work with procurement to coordinate bid evaluation, review, and award
  • Communicate with outside equipment and material vendors to specify requirements, obtain quotes, and follow up on purchases of equipment and services
  • Steward, plan, and oversee contractors, costs, progress against schedule, and scope of work
  • Assist and coordinate drawing and document reviews, RFIs, change proposal requests, and change orders, and incorporate changes into project documents
  • Coordinate interfaces between contractors and Golden Pass functions including Engineering Organization, Operations, Maintenance, and Turnaround Planning Team
  • Interface with Maintenance planners to schedule site activities for maintenance projects
Read More
Arrow Right

Senior Riser Engineer

Job Overview: The Senior Riser Engineer uses best practices and knowledge of int...
Location
Location
United States , Houston
Salary
Salary:
Not provided
mcdermott.com Logo
McDermott
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • 8-15 years of experience in oil and gas preferably in offshore facilities
  • Bachelor's Degree in Civil/Structural/Mechanical Engineering (Masters is a preference)
  • Strong working knowledge of many design techniques and analysis methods. Must have OrcaFlex
  • Has developed a good understanding of riser engineering process and tools
  • Understand the scope and contents of API, DNV, ISO, ASME, and other standards applicable to riser engineering
  • Preferably Registered Engineer in Training (EIT) or member of a professional engineering society
Job Responsibility
Job Responsibility
  • Perform conceptual FEED, Studies, and detailed design engineering, analysis, and calculations on more complex and demanding engineering tasks
  • Apply knowledge and skills to complete varied assignments
  • Prepare clear and accurate detailed design calculations and analyses including design reports and procedures
  • Prioritize and organize own work to meet deadlines
  • Focus on completing work within budgets
  • Clearly communicate and explain information in straightforward engineering activities
  • Focused on health and safety policies and procedures
  • Be fully familiar with the project scope of work, specifications, schedule, and all inter-discipline requirements
  • including identifying concerns as early as practicable and taking appropriate initiatives to address the issues
  • Identify changes to scope and promptly raise change notifications, including providing any necessary supporting documentation and estimates
  • Fulltime
Read More
Arrow Right

Designer 1

We have an exciting opportunity for an entry level engineer interested in a care...
Location
Location
United States , Greenwood Village
Salary
Salary:
Not provided
selectek.com Logo
Selectek
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Education: Bachelor’s degree in Mechanical or Electrical Engineering or GIS background, or associates in drafting
  • Strong communication skills
  • Reliable Transportation for use on the rare occasion a visit to a site may be required to take pictures and measurements.
Job Responsibility
Job Responsibility
  • Prepare project and job packages that include material lists, requisitions, labor estimates, site drawings and construction drawings for various installations of electrical facilities in a cost-effective manner that maximizes safety and service reliability
  • Read and interpret blueprints, maps, change orders, improvement plans, construction specifications, procedure manuals, operational procedures, etc.
  • Perform drafting work and assist in the preparation of designs, plans and reports
  • Make accurate engineering calculations
  • Organize and analyze field data and prepare accurate and detailed reports and records
  • Learn, practice, and promote ALL safety policies and procedures 100% of the time
  • Apply various codes, requirements, regulations, policies, and procedures to all assigned work
  • Use various design software and work management tools
  • Evaluate distribution equipment such as transformers and fusing
  • Follow utility construction practices on public right of way (ROW) and private land
  • Fulltime
Read More
Arrow Right

Project Manager

Allied Universal Technology Services is hiring a Project Manager to plan, organi...
Location
Location
United States , Phoenix
Salary
Salary:
Not provided
aus.com Logo
Allied Universal®
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • High School Diploma required
  • Associates Degree preferred
  • At least six years of project management experience, electronic security industry experience is preferred
  • A proven track record and verified references relating to the ability to manager 4+ Million Dollar projects to schedule and budget
  • Expert knowledge of PM techniques and tools, general knowledge of contract laws and regulations
  • PMP from the Project Management Institute, preferred
  • Ability to work independently, and perform tasks of moderate to high complexity, which requires knowledge of technical and business environments
  • Factory certifications in relevant technology platforms is a plus (Software House, Lenel, Brivo, Open Options, Exacq, American Dynamics, Milestone, OnSSI, etc.)
  • Proficient with MS Office Suite (Word, Excel, Outlook, PowerPoint, Project and SharePoint)
  • Ability to establish and maintain effective working relationships with both internal and external customers
Job Responsibility
Job Responsibility
  • Maintain an active and thoughtful communication pattern with vendors, internal and external customers while balancing time versus profits to make sure efforts reflect and anticipated return (revenue, growth and customer retention)
  • Consistently and effectively determine, allocate, and maximize available resources through project planning to ensure the achievement of sales and project management objectives
  • Establish and maintain an in-depth knowledge of the industry and competitive practices as they relate to multiple markets
  • Implements changes in project, contract price and installation plans to include the estimation, development and submission of Change Orders
  • Support company's invoicing and collection efforts by not only ensuring all contractual terms and conditions are met initially, but by ensuring all invoicing is completed accurately and on time by aggressively monitoring the reports in ERP System and following up with customers management and customers on a consistent basis
  • Manage Project budget and project P&L responsibility
  • Prepares the project installation plan, determines goals, manages the plan, prepares and implements job procedures
  • Maintains construction schedules and coordinates task-scheduling with other trades
  • Maintains all records of job status, job changes and material flow
  • Defines project problems by working with financial, contract management and management tools to assure project profitability
What we offer
What we offer
  • Medical, dental, vision, basic life, AD&D, and disability insurance
  • Enrollment in our company’s 401 (k) or Supplemental Income Plan, subject to eligibility requirements
  • Eight paid holidays annually, five sick days, and four personal days
  • Vacation time offered at an accrual rate of 3.08 hours biweekly
  • Fulltime
Read More
Arrow Right

Principal Instrumentation & Controls Eng

The Principal Instrumentation & Controls Eng is responsible for interpreting int...
Location
Location
United Arab Emirates , Dubai
Salary
Salary:
Not provided
mcdermott.com Logo
McDermott
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Bachelor’s Degree in Electrical, or Electronics and Instrumentation Engineering (Master’s Degree is preferred)
  • 15-20 years of experience in oil and gas with major contractors or consultants predominantly performing detail design
  • Preferably Registered Professional Engineer or member of a professional engineering society
  • Detailed knowledge of design techniques and analysis methods, and detailed knowledge of the theory, content, and application of standards, codes, and guidelines as applicable
  • Knowledgeable in project coordination and execution skills
Job Responsibility
Job Responsibility
  • Perform conceptual, FEED, and detailed analyses and design as per design basis, project specifications, design codes, and standards
  • Apply in-depth skills and broad knowledge of the business to address complex problems and nonstandard situations
  • Prepare clear and accurate detailed design calculations and analyses including design reports and procedures
  • Manage own time to meet objectives and (as Lead Engineer) forecast and plan resource requirements
  • Clearly communicate and explain difficult concepts and persuade others to adopt a point of view
  • Direct medium or large Engineering team as a Lead Engineer
  • Lead the Discipline engineering design of the assigned work area and completed within the planned schedule and budget, in accordance with standards, MDR, and project-specific procedures and to a high professional standard
  • Plan, organize, and direct all aspects of Discipline execution on the assigned project including scope, deliverables, schedule, and all manpower resources - agree allocations with the Discipline Manager
  • Ensure interfaces and deliverables are clearly identified
  • Maintain responsibility for progress and productivity, identifying any required corrective action
  • Fulltime
Read More
Arrow Right

Motor Vehicle Mechanic

The Motor Vehicle Mechanic repairs, rebuilds, or overhauls major assemblies of i...
Location
Location
United States , Cullman
Salary
Salary:
20.00 USD / Hour
amentum.com Logo
Amentum
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • High school diploma or equivalent required
  • 3 years minimum experience in the problem diagnosis, repair and maintenance of a wide variety of light, medium, heavy and/or specialized automotive equipment, other heavy equipment, and FAV vehicles
  • Must have a valid and current state driver's license
  • Must be knowledgeable of gasoline and diesel vehicle preventive maintenance programs
  • Excellent record of safety operations and working knowledge of safety standards for motor vehicle mechanical and electrical systems
  • Considerable knowledge of the operating systems used in motor vehicles and equipment
  • Considerable knowledge of the practices and tools used in the maintenance and diagnostics of vehicles and equipment
  • Considerable knowledge of computer, electrical, transistorized and other non-mechanical systems and how they tie-in with and affect the operation of mechanical systems
  • Considerable knowledge of the standard tools, equipment, test procedures and practices used in the repair and preventative maintenance of fleet and training vehicles
  • Ability to diagnose mechanical and related malfunctions
Job Responsibility
Job Responsibility
  • Maintaining and repairing government vehicles
  • Completing maintenance tickets and repair orders in a timely manner
  • Dispose of waste materials per regulations and applicable laws
  • Stay abreast of latest technology and installation procedures
  • Inspects diagnoses and isolates vehicle and equipment malfunctions
  • troubleshoots, traces and locates defects and/or causes of mechanical problems to determine type and extent of necessary repairs
  • Repairs all assigned vehicles and equipment to ensure they are safe and dependable
  • Repairs lighting systems, sirens, wheel bearings, radiators, heating and air-conditioning systems, springs, hydraulic systems, catalytic converters and fuel pumps
  • Utilizes on-board computer diagnostic systems and other test equipment in order to test automotive computer control and emission systems
  • assesses and analyzes malfunctions of machinery using microcomputers, calipers, gauges, and other equipment
What we offer
What we offer
  • Health, dental, and vision insurance
  • Paid time off and holidays
  • Retirement benefits (including 401(k) matching)
  • Educational reimbursement
  • Parental leave
  • Employee stock purchase plan
  • Tax-saving options
  • Disability and life insurance
  • Pet insurance
  • Fulltime
Read More
Arrow Right